Garbage Chutes for 59 Residential Blocks

Garbage Chutes for 59 Residential Blocks

Garbage Chutes for 59 Residential Blocks
Get a Free Quote

Fifty-nine six-storey residential blocks in Basra, Iraq, supplied in 2024 as one standardised package. The development repeats a single block design, so the chute specification was fixed once and issued across the whole site - 59 risers and 354 intake doors in total, all interchangeable between buildings.


Design Advantages

One design, built fifty-nine times


Fifty-nine residential blocks is not fifty-nine projects. Every block is six floors with

a single 24-inch (600 mm) SS304 garbage chute and one intake door per level, so the

drawing set is issued once and the approval covers every riser on the site.


Parts that fit any block


Three hundred and fifty-four intake doors, the same number of frames, brackets and sets

of expansion bolts, all cut to one specification and all interchangeable between

buildings. A batch this size only works that way: the moment one shaft is built 20 mm

off, the sections from the next block's pallet stop fitting.


Six floors needs a different bottom


Height is not the problem here. At six storeys the fall is short enough that bags land

rather than burst, and the shaft never develops the stack effect of a 50-storey riser.

What matters is the collection room at ground level, emptied daily by a caretaker: the

discharge gate has to open easily and close on its own, and the outlet has to clear a

standard bin without a hopper.


Shipping in the construction sequence


A site of fifty-nine blocks is handed over in phases. Sections ship in batches keyed to

the handover schedule rather than as one consignment, so the site never holds material

for blocks that are not ready. Each crate is marked to its block and floor, because

unmarked crates turn into a sorting job on site.


Where the saving actually comes from


Not from the steel. It comes from the drawing set, the approvals and the installation

labour: one approval covers fifty-nine shafts, one crew learns the install once and

repeats it, and one set of spare parts fits every block on the site.

What QDCE Supplied

QDCE supplied 59 identical risers, shipped in batches matched to the site handover

schedule:


- 354 intake doors, UL 10B, 1.5-hour rating

- SS304 duct sections, 24" (600 mm) diameter, 1200 mm and 600 mm lengths

- Wall brackets, expansion bolts and steel liners

- Fuse-linked discharge gates, 74°C (165°F), one per riser

- Crates marked to block and floor


Installation was by the site contractor, block by block, following the same sequence

fifty-nine times.


INDUSTRY SOLUTIONS

Full-Cycle Solutions

We build garbage chutes for residential towers. Not a catalogue item bolted to a wall — a shaft, a door on every floor, a discharge arrangement and a ventilation path designed together, because in a residential building those four things fail together.

Hotels usually need both lines: a hotel garbage chute for the guest floors and a hotel laundry chute for housekeeping, designed as one hotel chute system.

We supply the construction waste chute that takes debris off the floor while the building is still going up. HDPE sections light enough for two people to carry, a bracket that anchors to the slab, and a set your own crew installs and takes down as the work moves up.

Hospitals run two separate streams — a hospital garbage chute line for refuse, a hospital linen chute for soiled linen — and neither should be carried through patient areas. We build both to the same performance specification: hands-free intake, code-rated fire doors, and a shaft held under negative pressure.

A home laundry chute is a gravity chute that takes laundry from the upper floors to the laundry room, so nobody carries a basket down the stairs. In its standard form there is no power, no controls, and nothing to maintain beyond the door.

GET IN TOUCH

We're just a call away

Contact details

0

sales@qdchute.com

+86-133-5685-6582

+86-133-5685-6582